Factory direct from Jingdezhen · Wholesale, OEM and retail

OEM & ODM Ceramics, From Sketch to Container

Bring a sketch, a reference piece or just an idea. Our 42-person design and R&D team turns it into a shape, a glaze and a decoration that can be made at scale, then our own lines make it. Your logo goes on the product and the carton. Ours does not.

What you can customise

Logo decoration options

Transfer decal being applied to a white porcelain mug
Transfer decal
Underglaze logo decoration on white porcelain
Underglaze
Laser-marked logo on a porcelain surface
Laser marking
Gold rim on white porcelain tableware
Gold rim

Glaze colour options

Glaze colour library of test samples
Glaze library
Fan of glaze test tiles from cream to sea green and blue-grey
Glaze test tiles

MOQ and lead time

Order typeMOQLead time
Mixed stock48 pcs7–10 days
Existing model500 pcs25–30 days
New glaze colour1,000 pcs30–35 days
Your decal, one colour1,000 pcs35–40 days
Your decal, multi-colour or gold1,500 pcs35–40 days
New mold3,000 pcs45–55 days
Private label programme5,000 pcs per SKU50–65 days for the first order
Hotel and project200 pcs per shape30–40 days
Gift box sets1,000 setsPer project
Luxury small batchNo minimumPer project

MOQ is not one number: it follows what you change. A stock model needs no set-up, a new glaze needs its own test firings, a new mold has to be cut, and each row above prices in that work. A 1,000 pcs decal or glaze minimum can be split across several models and colours. Lead times count from deposit and signed artwork. July to October adds 7–10 days.

Samples and tooling

Private label in practice

A German discount retailer (D-01) has sold our dinner sets under its own label since 2019: 16 and 20-piece sets, 3.4 million pieces a year in 12 deliveries, all from a glaze recipe locked to its account.

Most private-label programmes start from a shape we already make: our dinnerware sets, ceramic mugs and porcelain gaiwans can all carry your glaze, decal and packaging.

More customer cases

Our private label guide walks through a programme step by step.

From enquiry to container

Every custom project follows the same six steps, and you get something in writing at each one.

StepWhat happensYou receive
1 EnquiryYou send shape, quantity, market and packing needsQuotation and specification sheet
2 SamplesStock samples ship in 3 days; custom samples in 7–15 daysSamples and test data
3 ApprovalSigned sample, contract and depositOrder confirmation and production schedule
4 ProductionClay, forming, glazing, firing, decorationPhoto progress report every 10 days
5 InspectionYou or a third party inspect to AQL 2.5Inspection report
6 ShippingLoading, export clearance, documents, arrivalFull document set and tracking

Tooling and development times

Molds, decal plates and gift box artwork made for your project belong to you.

ItemTimeWho owns it
New decoration on an existing mold7–10 days
New mold12–15 days for the model, 15–20 days for the moldsThe mold is yours
Decal plates5–7 daysThe plates are yours
Underglaze or laser logo plate5 days
3D-printed prototype3 daysCharged at cost
Exclusive glaze colour20 days
Gift box design5 days, up to 3 rounds of changesThe artwork is yours
Stock samples2 pcs free, sent in 3 daysFreight collect

What changes cost, and what does not

Every custom request is a set of separate changes, and each has its own minimum and lead time. A new glaze colour on an existing shape is 1,000 pieces and 30 to 35 days. A one-colour decal is 1,000 pieces and 35 to 40 days; several colours or gold, 1,500. A new shape is a new mold, 3,000 pieces and 45 to 55 days, because the model takes 12 to 15 days and the molds another 15 to 20. A private label programme with its own packing and barcodes runs at 5,000 pieces per SKU and 50 to 65 days for the first order.

Most briefs need fewer of these changes than they first list. A buyer who wants a new handle often wants a new look, and a new colour or decal on one of our 3,800 molds gives that in a third of the time. We say so when we quote, and we print a 3D prototype in 3 days when the shape really has to change.

Quantities and lead times for custom work

Our dinnerware MOQ guide explains what each change adds on the line and how to keep the minimum down.

Design and intellectual property

Our 42-person design and R&D team (18 in materials and process, 14 in shape and structure, 10 in pattern and visual design) releases 4 themed ranges and about 180 new patterns a year. New designs brought in 31% of our revenue in the year they launched.

TypeNumberNotes
Trademarks360In 31 countries; 12 through the Madrid system, plus the EU, US, Japan, Korea and Australia
Patents670512 design, 118 utility model, 40 invention
Copyrights500Patterns, shape drawings, packaging designs
Standards153 national, 5 industry, 7 association standards

Reports your product can carry

New shapes and decorations are tested before shipping, and food-contact surfaces use underglaze or in-glaze only.

Custom orders: the figures in brief

The minimums and reports that apply once you change a colour, a decal or a shape.

TopicWhat applies hereFull details
Minimums and lead timesNew colour or glaze: 1,000 pcs, 30–35 days; Custom decal, one colour: 1,000 pcs, 35–40 days; Custom decal, several colours or gold: 1,500 pcs, 35–40 days; New mold: 3,000 pcs, 45–55 days; Private-label programme: 5,000 pcs per SKU, 50–65 days for the first order.Shipping and trade terms
Who ordersSupermarket private label: 16- and 24-piece sets, mugs, storage jars, typically 30,000–80,000 pcs; Airlines and airports: High-white cups, saucers and tableware, typically 10,000–50,000 pcs; Museums and cultural brands: Replica shapes, co-branded cups, typically 3,000–20,000 pcs.Customer cases
Test reportsFDA CPG 7117.06/07, ASTM C738, ASTM C927, covering 14 series, 62 SKUs; LFGB §30/31, (EC) No 1935/2004, covering All food-contact shapes; Food Sanitation Act, MHLW Notice No. 370, covering 22 Japan-line SKUs.Certifications
CapacityTotal: 22 million a year, 17.8 million delivered in 2025.Company facts
Lab testsICP-MS (Agilent 7900): Lead and cadmium release to FDA and LFGB methods; Spectrophotometer (X-Rite Ci7800): Colour difference ΔE at D65/10°.Quality control

From brief to container in six steps

01

Brief

Send a sketch, photo or reference. First reply within 24 working hours, quote within 48.

02

Sample

Two stock samples free in 3 days. 3D-printed prototypes of new shapes in 3 days.

03

Tooling

New molds in 15–20 days, colour-matched on site.

04

Production

Progress photos every 10 days.

05

Inspection

AQL 2.5 final check, with your inspector welcome.

06

Shipping

Loaded within 5 days of a passed inspection, documents within 3 working days of sailing.

From 48 pcs of mixed stock, 500 pcs per existing model, 1,000 pcs for your own decal and 3,000 pcs for a new mold. Luxury small-batch projects have no minimum.

Ceramic development in six steps

Product sketch for a new ceramic shape
1. Sketch
CAD drawing of a new ceramic mug
2. CAD drawing
Hand holding a 3D-printed prototype of a mug in front of the printer
3. 3D-printed prototype
Plaster production mold opened beside an unfired clay mug
4. Production mold
Worker applying a blue floral decal to a white porcelain mug
5. Decoration
White porcelain mug with a blue sprig decal in a moulded pulp packing insert
6. Packing

Custom services

Hard or unusual brief? See our bespoke & complex projects: printed ceramic lanterns, museum replicas, airport lounge porcelain and special-shape bottles, each with the brief, the problem and how we solved it.

Before you brief us, the eight steps we would follow to source dinnerware from China cover MOQs, test reports, inspection and landed cost in one place.

FAQ

500 pcs for an existing model. Mixed stock starts at 48 pcs, a new mold at 3,000 pcs, and luxury small-batch projects have no minimum. See the table above.

25–30 days for an existing model, 45–55 days with a new mold, counted from deposit and signed artwork.

Yes. Orders placed for July to October take 7–10 days longer, so book early for Christmas.

Two stock samples are free; you pay the courier. Prototypes of new shapes are charged at cost.

You do, once you have paid for it. We keep it for your repeat orders.

Yes. Cartons, labels and inserts carry your brand only.

You do. New molds take 12–15 days for the model and 15–20 days for the production molds, and they stay yours.

50–65 working days, from 5,000 pcs per SKU. Reorders run on the standard lead times.

Yes. Send a drawing, photo or 3D file; we can print a prototype in 3 days.

We take the whole development and work with metal and glass partners. See our case files for ten examples with test data.

Tell us what you need

A product, a quantity and a market are enough to start. We reply within 24 working hours.

Prefer to talk directly?

WhatsApp +852 5501 1456
MaraAnestiade@gmail.com

Scroll to Top